IEEE Rail Transit
Vehicle Interface Standards Committee
MEETING OF WORKING GROUP #2
COMMUNICATION BASED TRAIN CONTROL
PERFORMANCE REQUIREMENTS
January 21, 1998 - 830 am
Tentative Meeting Agenda
830 - 900 COFFEE
900 - 930 HOUSE KEEPING
930 - 1200 FOLLOW-UP ON
ACTION ITEMS FROM PREVIOUS MEETING
Comments
received to date on the "strawman" draft of the proposed standard
(Alan Rumsey to summarize) Identification of required operating modes to be
supported by CBTC systems - ref. section 4.5 of the standard
1030 - 1045 Break
Develop
proposed wording for sections 5.1 and 5.2 of the standards with respect to
capacity/headway/travel time criteria for CBTC systems
1215 - 115 LUNCH (Provided
by GE-Harris)
115 - 145 PRESENTATION BY
GE HARRIS
145 - 400 FOLLOW-UP ON
ACTION ITEMS FROM PREVIOUS MEETING
Develop
proposed wording for section 5.3 of the standard with respect to safety
criteria for CBTC systems (compatible with requirements being developed by WG4)
245 - 300 Break
Develop
proposed wording for section 5.4 of the standard with respect to availability
criteria for CBTC systems
400 - 445 ADDITIONAL
COMMENTS ON DRAFT STANDARD
445 - 500 SUMMARY OF MEETING
ACTION ITEMS AND OBJECTIVES FOR NEXT MEETING